Unit Ventilator Upgrades

·         Phase I: Wanamassa and Ocean Township Elementary School:

This work has been completed. Closeout Documents have been requested from the contractor.

·         Phase II: Ocean Township HS and Wayside Elementary School:

This Project design has been completed and is currently out to Bid. Bids shall be received on February 9th, 2016.

Ocean Township Intermediate

·         Science Classroom and Gym AC Upgrades:

This work has been completed. Closeout Documents have been requested from the contractor.

Wayside Elementary School

·         SGI Classroom Addition and Alterations:

The Construction Documents for this project have been completed and it is currently out to Bid. Bids shall be received on February 9th, 2016.

Wanamassa Elementary School

·         Gymnasium and Classroom Addition and Cafeteria Alterations

The Construction Documents for this project are 95% complete. The project is scheduled to go out to bid on February 9th, 2016.

Ocean Township High School

·         Athletic Addition:

This project design documents are approximately 70% complete and are scheduled to go out to bid on February 9th, 2016. Project meetings have been conducted with district staff to finalize floor plan layouts and review interior and exterior finishes, along with fixtures and equipment.

·         Performing Arts Addition:

This project design documents are approximately 75% complete and are scheduled to go out to bid on February 9th, 2016. Project meetings have been conducted with district staff to finalize floor plan layouts and review interior and exterior finishes. Theatrical Arts vendors have been consulted to provide fixture and equipment recommendations to be incorporated in the new work.

Sound Amplification System

·         The district is currently running a 30 day demonstration of equipment by Listen Technology to see how it compares to equipment currently in place, manufactured by Front Row. A Front Row representative will also present to the district, a permanent version of their currently installed portable sound amplification units.


________________________________________

Special Election Voter Information

Application for Vote By Mail Ballot (pdf) 

More...

Solicitud_de_Inscripción_de_Votantes (pdf) 

More...

New Jersey Voter Registration Application  (pdf) 

More...

Solicitud_de_Boleta_de_Votantes_Civiles_Ausentes (pdf) 

More...

_____________________________________

Referendum FAQ

______________________________________


Referendum Meeting Dates